Laundry Project: To complete the construction of a 10,000-man post laundry. Description: A regiment of combat engineers that left the island, shortly after the arrival of the 353rd Engineer Regiment, had started a laundry that was to provide laundry service for the island. Completion of this laundry consisted of installation of utilities and some miscellaneous carpentry work. Maintenance of certain roads. Description: In addition to the maintenance of Colonial Route No.1 the regiment was charged with the maintenance of certain secondary roads on the island. The total mileage of these secondary roads was approximately forty miles. These roads were for the most part roads that had been constructed by the French and were unsuited for heavy military traffic. In some cases maintenance involved the reconstruction of the road. Several bridges were also rebuilt. | |||
This document has been transcribed from scanned images. The original scans are available from the museum on request. | |||
Home | Back to Document Index | Previous | Next |