Home | Back to Document Index | ||
HEADQUARTERS 1177TH ENGINEER CONSTRUCTION GROUP A.P.O. #709 330.3 24 April 1945 SUBJECT: Commendation. TO: Commanding Officer. 1394th Engineer Construction Battalion, APO #709. 1. I desire to commend the 1394th Engineer Construction Battalion for the excellent performance of its assigned tasks from the period of its activation, 1 May 1944, to 20 April 1945. 2. During this period the battalion has played a most important part in the rebuilding of the base at Guadalcanal. All personnel of the battalion can take a great deal of professional pride in noting the vast improvements that have been made by them in the storage areas, bivouacs, port facilities, roads and bridges of the island. The follow- ing are the major projects which were creditably completed by the battalion: Construction of 20th Station Hospital Lunga Water Treatment Plant and Distribution System Rehabilitation of Medical Depot Rehabilitation of Chemical Depot Rehabilitation of Ration Dump No. 5 and 7 Construction of Recreation facilities Completion of 48th Station Hospital Construction of Ration Dump No. 1 Port Storage Areas Farm and Forestry Roads 3. The battalion has frequently been called upon to act in emer- gencies and has always responded with resourcefulness and determination. 4. Additional significance may be attached to the accomplishments of the battalion inasmuch as a large portion of its construction program was accomplished under extremely adverse weather conditions and during the period of organization when adequate equipment was not available. 5. I thank all ranks for their loyal service and cooperation. It is my heartfelt wish that the battalions of the Group may be reunited in the next undertaking. WENDELL P. TROWER Colonel, C.E., Commanding. Note: The scan of the document that this transcription is based on is available on request. | ||
Home | Back to Document Index |